Skip to main content
Article Archive

Case Study: Electrical Inspection on MCC Cabinets with Ultrasound

Date: August 01, 2025
Case Study: Electrical Inspection on MCC Cabinets with Ultrasound
The Motor Control Centre is a very important component of industrial electrical infrastructure. By providing control & protection to electric motors and other production assets, a healthy MCC cabinet improves the efficiency, reliability, and safety of a facility.

Read More

Advertisement

Latest Articles

Stationary Battery String Testing Using Infrared Thermography

February 10, 2026

Canary Islands Underground Water Leak Detection Using Aerial Thermography

January 02, 2026

Thermal Exception Case Study

November 18, 2025

Case Study: Electrical Inspection on MCC Cabinets with Ultrasound

August 01, 2025

Detecting Contamination and Preventing Insulator Flashovers: Why UV Imaging Is a Critical Tool for Utilities

June 18, 2025