When performing infrared inspections of electrical distribution systems, many people identify the individual phases of polyphase circuits as A, B, and C; others frequently use 1, 2, and 3.

Confusion can arise with alphabetical or numerical labels particularly when switchgear enclosures are inspected from different perspectives e.g. front versus rear. Further confusion can occur when phase rotation has been modified or changed or, in some cases, mislabelled.

Reference errors can be avoided by using terms that cannot be confused such as Left, Middle, Right OR Upper, Middle, Lower. When using such terms, one should always reference where the image was taken from. For outside power lines references such as Street, Center, and Field may be used to identify phases without confusion.

Using the above simple terms can make your reports easier to understand and help to eliminate confusion when repairs are performed.

Infrared inspection of electrical distribution systems is one of the many applications covered in the Infraspection Institute Level I Certified Infrared Thermographer® training course. For course schedules or to obtain a copy of the Standard for Infrared Inspection of Electrical Systems and Rotating Equipment, visit Infraspection Institute online at www.infraspection.com or call us at 609-239-4788.

Advertisement

Latest Tips

IR Inspections of Photovoltaic Systems

May 05, 2025

Checking IR Equipment Calibration

April 28, 2025

The Rise of Medical Thermography – A Game-Changer in Healthcare

April 21, 2025

Should Infrared Thermographer Certification Expire?

April 14, 2025

Determining Maximum Operating Temperature for Motors

April 07, 2025